Skip to content
MachLoad

Resources / Guides

The machinery export compliance guide

Twelve pages on the things that stop a machinery container at the destination port: unmarked timber, missing rust protection, lashing that was never planned. Written by people who load boxes, not by a marketing team.

Get the PDF by email

One PDF now, plus occasional loading guides. Unsubscribe in one click. No resale of your data, ever.

What is inside

Each section ends with the check the dock crew actually performs, written as an instruction rather than a principle.

Who it is for

  • Export managers signing off a first shipment to a new market.
  • Freight forwarders who need to explain the rules to a shipper.
  • Factory logistics teams tired of rebuilding the same checklist.
  1. 1

    IPPC and wooden packaging

    Which packages need the ISPM 15 mark, what each element of the stamp means, and the repair mistakes that get containers held.

  2. 2

    Load geometry and the 40% rule

    How centre of gravity height is calculated, why it matters more than gross weight, and the 60% half-load rule explained with a worked example.

  3. 3

    Blocking, bracing and lashing

    Timber blocking patterns for heavy crates, when airbags are appropriate, and how to plan lashing points from the container drawing.

  4. 4

    Rust and moisture protection

    Rust-preventive coatings, VCI paper, desiccant quantities by container volume and voyage length, and how to record what was applied.

  5. 5

    The pre-shipment checklist

    The nineteen checks we run between the loading plan and the sealed container, in the order the dock crew works.

Prefer to see it in a plan?

The calculator applies the same checklist to your own cargo. Three full runs a month are free, no card required.

Try the calculator